Case Study

The Dyson

Institute

A two stage project for the accommodation to house

the student inventors for Dyson.

PROJECT WORK

Supply and installation of the

mechanical and electrical

installation to the Building

and it’s accommodation pods.

LOCATION

MALMESBURY

PROJECT VALUE

£1.6 M

£1.6M

Project Value

40 Weeks

Project Duration

Project Details

A two-stage project for the accommodation to house the student inventors for Dyson.

Stage one included the mains water, power, life system and drainage for the infrastructure to pods installed on a purpose-built bund in a horseshoe shape with multiple pods being stacked and served from a central walkway.

External lighting and CCTV were also installed to ensure safe access to the pod entrances, with lights built into staircases and bollards. Supply and installation of mains power, services, water, waste and connections to externally created accommodation pods.

Stage two was the supply and installation of the mechanical and electrical installation to the Communal Building, a social space dedicated to the students living in the accommodation pods.

Our Accreditations

Professional qualifications and accreditations have been earned by VME and key team members, allowing us to be fully conversant and compliant in delivering your M&E projects to the highest standards.

VME Mechanical & Electrical Services Ltd, Unit 4 Old Farm Court, Nursling Street, Rownhams, Southampton, Hampshire, SO16 0AJ

VME Mechanical & Electrical Services Ltd, Unit 4 Old Farm Court, Nursling Street, Rownhams, Southampton,

Hampshire, SO16 0AJ

Copyright 2023 PFMR Ltd : All Rights Reserved